Monday, March 31, 2008

Informercial Production

Tuesday, April 1
-Read through scripts. Make corrections and edit
-Bring props; all outtakes must be completed by the end of the period.
-Sign up for a practice time and a taping day.

-All work must be edited before actual taping.

Wednesday- Thursday
-Practice run through; Your group must be in full dress; script and staging area must be blocked; all props used must be present during this practice or they will not be allowed in the actual production. (This includes clothing, sets, objects needed, etc).

Friday, April 4-Friday, April 18
Film(4/4-4/8)
Block projects with Mrs. Christian (Tuesday, April 8)
Edit Outtakes (4/9-4/11)
4/14 (Mon) Group 1- Studio reserved
4/15 (Tues) Group 2- Studio reserved
4/16 (Wed) Group 3- Studio reserved
4/17(Thurs) Group 4 Studio reserved
4/18 (Fri) Viewing day.

**All projects must be completed by Friday, 4/18-- NO EXCUSES.

Grading: See score sheet
Areas: Studio work
Group work (outtakes)
Formal script including all studio directions and graphic cue and cuts
editing
video quality
subject quality
Theme
Consistency- in video, theme, props, costumes, acting, etc
Audio quality


-All groups must participate or cooperate in the filming process
-Any student found listening to music, playing games, or doing other "non-journalism" related projects will receive a zero as a grade.

No comments: